Job in Kildare by Harald ID: 6553164

New sink , pull out tap and dishwasher need to be installed in new kitchen – new position has been shifted about 1 m to the right from old sink – so incoming water and wastewater pipes need to be extended by approx 1m. Also to pre-plumb outlet for Qettle/quooker for future. And to fix tap in bath – the tap has play when turned (its the standard 2 tap heads and not single lever). Custom kitchen by a carpenter – he is starting to remove old kitchen on 2 may. Start date 5 may firm. Its 2 visits i think – first to do the piping and then, when the kitchen is in – to connect everything. Carpenter will cut the opening for sink (its simple laminate worktop 25mm). Sink is top mounted.

Sign in to post a quote
Don't have an account? Registration is free for all tradesmen.